Did you get the little pop-up window notice thingy? I’m never sure if that’s working for everyone.
Anyway... I’m moving the site over to the new server tonight, starting at 6:30. Sometime after 7:00 there will be some downtime while we calibrate the digital flux capacitor.
If you have any problems after all this you can PM me, post in this thread, or send a message via the Contact link at the bottom of the page.
Anyway... I’m moving the site over to the new server tonight, starting at 6:30. Sometime after 7:00 there will be some downtime while we calibrate the digital flux capacitor.
If you have any problems after all this you can PM me, post in this thread, or send a message via the Contact link at the bottom of the page.